- T1: move $100 from account A to account B — debit A by $100, credit B by $100
25:41. - T2: compute and report the sum of all accounts (A + B)
25:59. - The
ECHOin the slides is not real SQL — just notation for the transaction's return value25:59.
Case 1 — No two-phase locking: wrong answer
Interleaving: T1 locks A, debits it, unlocks A; T2 then reads the reduced A, unlocks A, and grabs the shared lock on B before T1 can get the exclusive lock on B; T2 reads the pre-credit B and prints the total; only then does T1 credit B 25:59, 26:49.
- Result: T2 reports A + B = $19,900 — the bank appears to be missing $100, because it saw A after the withdrawal but B before the deposit
26:49. - No serial ordering of T1 and T2 could produce that output
27:31.
Case 2 — Basic 2PL: correct answer, still interleaved
T1 acquires X on A, T2 stalls on the shared lock for A. T1 acquires X on B before releasing X on A (growing phase completes first), then releases A. T2 resumes and reads A, then stalls trying to get the shared lock on B. T1 adds $100 to B, unlocks and commits, and T2 finally reads B 27:31, 28:01.
- Genuine interleaving still occurs — T2 read A while T1 was still working on B — but the result is correct
28:01,28:17.
Case 3 — Strong strict 2PL: correct, effectively serial
T2 blocks on the shared lock for A until T1 commits, because T1 holds every lock it acquired until the very end 28:17.
Summary
| Protocol | T2's reported total | Parallelism |
|---|---|---|
| No 2PL | $19,900 (wrong, $100 lost) 26:49 | highest |
| Basic 2PL | correct 28:01 | some interleaving retained |